Run the best schedule your plant can run — and see it in the P&L.

Fewer shorts, fewer changeovers, less overtime. Prodooo finds the plan your plant can actually run — and that holds when a line goes down.

Built for beverage. Runs alongside SAP, Blue Yonder and Kinaxis.

The schedule is the largest uncontrolled variable in your plant.

And it is a complex combinatorial problem.

Capex is committed. Labour is fixed. Formulations are locked. The schedule is rebuilt every week — and it decides how much of your capacity you get to sell. Most bottlers hand that decision to one planner and a spreadsheet. The planner is very good. The problem is larger than any person.

Plant 4 — product flow, Tuesday 06:00
Illustrative scenario. 5 syrup tanks, 4 blend tanks, 6 filling lines, 214 active SKUs.
Current schedule
SYRUP ROOM BLENDING FILLING
← swipe to see the full plant →
Cola Cola Zero Lemon-Lime Orange Sparkling water Crossed transfers: 7
Cases scheduled this week
1.38M
Changeover & CIP hours
58.5
Filler utilization
71%
Case fill rate
94.2%

What last week’s schedule cost you.

Scheduling is usually pitched as a cost story. In beverage it isn’t — the bigger number is almost always the sales you didn’t make because the right SKU wasn’t on the right line in the right week.

Top line

Sales you stop losing

Fill rate is a scheduling outcome, not a forecasting one. When the sequence is right, the cases exist when the order lands.

  • Higher case fill rate and OTIF on national accounts
  • Fewer promo and seasonal-peak shorts
  • Faster response to demand that arrives early
  • Less substitution and fewer customer penalties
Bottom line

Capacity you stop burning

Every avoided changeover is production hours back, plus the water, chemicals and syrup that went with it.

  • Fewer changeovers and CIP cycles per week
  • Reduced overtime and weekend running
  • Lower finished-goods inventory and write-off
  • Capacity released without capex
  • Fewer expedited shipments and emergency freight
  • Fewer renegotiated delivery commitments, and less planner and co-packer time absorbing the change
Water
Not used, per plant per year, on CIP cycles that no longer run
Energy
Avoided from fewer heat-ups, sanitation cycles and idle running
Material
Syrup and packaging not lost to changeover flush and rework

Not a separate sustainability feature — the same avoided changeovers, in the units CSRD and Scope 1 already ask for.

Every Prodooo schedule arrives costed against the plan you would otherwise have run — so the number is on the plan, not in a business case somebody writes afterwards.

Week 41 · Plant 4 · worked examplevs. current plan
DriverCurrentProdoooΔ
Changeover & CIP hrs412171−241
Forecast short cases38,4004,100−34,300
Finished goods days11.48.9−2.5
Overtime shifts146−8
Contribution impact—your figures—

Prodooo searches that space, and hands you the plan that wins.

It takes your demand plan, your master data and your plant’s physical limits, and evaluates millions of possible sequences against all three production stages at once — syrup, blending and filling, solved as one problem rather than three.

What comes back is a conventional schedule board your planners can read and edit. Their sequencing rules go in first, so nothing is proposed that the floor can’t run — and that knowledge stays when they retire. You set how far it leans toward service or efficiency, and every schedule arrives costed against the plan you’d otherwise have run.

Plant 4 — 48-hour horizon
Illustrative scenario. Optimized sequence, 5 SKU families.
Prodooo schedule
00:0012:0024:0036:0048:00
Cola Cola Zero Lemon-Lime Orange Sparkling water Changeover CIP
Planning policy · Plant 4 · worked exampleWeek 41
Protect serviceMaximize efficiency
Peak seasonCurrentShutdown week

Four things a spreadsheet cannot do.

One Tuesday, two schedules.

Both plans fill the same orders in a normal week. The difference only shows up when something breaks — which is most weeks.

At 09:00 the filler on Line 2 goes down for nine hours, with 22,000 cases in the affected window.

The hand-built schedule had Line 2 running the only 2L format that week, so the volume has nowhere obvious to go. Moving it to Line 3 needs a format change, so a CIP, which pushes Orange into the night shift — and Orange was feeding the blend tank Line 5 was waiting on. Six lines get resequenced to absorb one failure.

Prodooo had already spread that 2L volume across two lines earlier in the week, at the price of one extra changeover on Monday. When Line 2 stops, the recovery touches two lines and finishes inside the shift. Nothing is renegotiated with a customer.

That Monday changeover is what robustness costs — the cheapest line in this table.

Line 2 filler down · 9 hrsworked example
Same failure, two schedules. A modelled plant, not a customer — Plant 4 from the diagram above, 22,000 cases in the affected window.
Blast radiusHand-builtProdoooΔ
Lines needing resequence62−4
SKUs moved195−14
Added changeovers72−5
Shipments re-booked112−9
Delivery dates renegotiated61−5

Both schedules fill the same orders in a normal week. The difference only appears when something breaks — which is most weeks.

Does this mean replacing everything you already use?

No. Prodooo reads your master data and demand plan, solves the production schedule, and writes the orders back. Your ERP stays the system of record, your planners keep their reporting, and nobody rebuilds an integration landscape to run a pilot.

SAPECC and S/4HANA. Reads materials, routings and demand; writes process orders back on approval.
Blue YonderTakes the demand and supply plan as input and returns the executable production sequence beneath it.
KinaxisRuns as the detailed scheduling layer under RapidResponse, so planning scenarios keep working as they do now.
MES & historiansActual run rates and downtime feed back, so the model learns your real line behaviour rather than its rated speed.

A pilot runs on a flat-file export if that is faster. The integration is worth building once the number is proven, not before.

Your production data doesn’t leave your control.

Schedules reveal capacity, cost structure and customer commitments. We treat that accordingly, and we’ll go through your security review before we ask for a purchase order.

Single-tenant isolation

Your data is never pooled with another bottler’s, and never used to train models for anyone else. Your plant model stays yours, including if you leave.

SOC 2 Type II & ISO 27001

Certification in progress. Current controls, penetration test results and architecture available under NDA.

Deploy where you need it

Cloud, your own cloud tenancy, or on-premise for plants with restricted network policies. Scheduling runs on master data and orders — no personal data is required.

The questions we get asked first.

We already own SAP. Isn’t this what we bought it for?

SAP validates a schedule someone already decided on; it doesn’t search the sequence space. Most teams we meet are exporting to Excel to build the actual sequence.

How is this different from o9, Blue Yonder or DELMIA Quintiq?

Those are horizontal platforms configured per industry, and only as good as that configuration. Prodooo ships with the three-stage beverage model already built. Narrow on purpose.

Our schedulers have twenty years of judgement. Does this override them?

No — it gives them a bigger search. Their rules become explicit constraints, every schedule is editable, and an override re-solves the rest of the plan.

What do you need from us to start?

Twelve months of demand history, SKU and routing master data, changeover matrices, tank and line capacities. If the changeover matrix is incomplete, we reconstruct it from historian data.

What does implementation actually involve on our side?

Two weeks of modelling, most of it ours. From you: the data extract, and a few hours a week from one planner to confirm the rules.

Who runs this day to day — do we need a data scientist?

Your planner does, from the schedule board. If they can build a sequence in Excel today, they can run Prodooo. No solver knowledge required.

How do we know the schedule is actually runnable?

Shadow mode. Prodooo builds a schedule alongside your team’s for four to six weeks, with no operational risk. You compare on real weeks before anything reaches the floor.

How long until we see a number?

Six to eight weeks on one plant: two to model it, four to six in shadow. You end with a costed comparison on real weeks, not a demo.

What happens after the pilot if we want to stop?

You stop. The pilot runs alongside your existing process, so there is nothing to unwind — and the plant model goes with you.

What happens when a plant does something the model didn’t expect?

Prodooo compares planned to actual every shift. Persistent deviations — a line that never hits rated speed on 2L — get surfaced, confirmed, then folded in.

Bring us one plant and one quarter of history.

We’ll model it, run it in shadow mode against your own schedulers, and show you what the difference is worth.